2012 national competition project #137 | cafeteria redesign
The school of John Hay in Cleveland Ohio, would like to compete in the Redesign of My school cafeteria project. Since the building has been here for a long time, we believe our school can greatly use new renovations, a new layout and, and a whole new image to allow everyone to have an effecient and safe time in the cafeteria for all student, staff, and visiters of the school, while still appeasing to the beutiful architectural style of iur school.
AD Jason's work for the Collect Information step:
Summary
To create a new cafeteria, I must think who uses the cafeteria.
I have come up with five different users of the Cafeteria:
1. Students
2. Teachers
3. Security...
0 comments
Then, we visited our janitors to look at our school blue prints. We needed to see how our cafeteria...
As you can see, our cafeteria is very bland. Theres is little decorations and dull colors. Colors...
As you can see our arched ceiling, it is very beautiful but has many drawbacks. This causes noise...
Our serving lines are very small. They only let a few kids be served at a time. Our luch time is...
This is the back storage area where our lunch staff prepare foods. This room is very small and the...
Then we measured the total room so we can make a scale drawing of the redesigned cafeteria
AD Jason's work for the Brainstorm Ideas step:
Summary
I now started to think about what to change. The layout, furniture, materials, design, ect. Then I came up with many sketches of the ideas I had.
At first, I wanted to reduce costs of the redesign and not move any of the core places like the...
Then we thought that seniors barely use the cafeteria. So we took out the senior only part and...
Instead of a circular table, we decided to change in into a octagonal table for increased elbow...
We decided not to remove walls for an outdoor are. We decided to add to the outside an extended...
























