2012 national competition project #207 | cafeteria redesign
As my school is slated to close this next month, this project allowed me to look at my wonderful school through new eyes. I could do anything I wanted, but at the same time it was bittersweet. I've never gone anywhere else and I can't believe this is happening and I can't imagine going anywhere else. This project made me appreciate the bones of my school even more than before. As I prepare to say goodbye, you will be seeing my work and all that my school has taught me. Thank you so much for this opportunity.
Chawby's work for the Collect Information step:
Summary
For this project, my architecture class went to the lunch room and took many pictures and took measurements. We also talked to the staff about how their wants and needs were being met.
This is the elementary and child development center (CDC) entrance to the lunchroom, it goes...
0 comments
The serving area and "check out" area. it only has one door and is usually really slow to...
Main entrance to the cafeteria for the high school and middle school. It is small and dark and is...
Chawby's work for the Brainstorm Ideas step:
Summary
First, i had to consider the space available, which was limited, so i decided to rip out the floor above to give it a more spacious feel and allow for more windows.
a floor plan of the floor above the current lunchroom with my edits. the blacked out area would...
The foot print of our school building with the current location and the best views, directions,...
some rough sketches of the outdoor courtyard i wanted to add off the back of the current lunchroom.
Chawby's work for the Develop Solutions step:
Summary
Once I decided that to get enough light in, i would have to open up to the floor above, it gave me a whole new space to work with.
this is a look at the elevations/ looking in to the cafeteria as well as a few views from above...
i thought about covering the patio, so this is a view of the sketches i did as well as the idea of...
























